Here is the back of the garage. We have dug out part of the ground to add a new bathroom off the garage so that there will be access to an outside bathroom from the pool. Here is what it looked like before with the old garage.
Here is the new space with no garage. You can see the addition of the new bathroom (it is in green). There will be a door added beside the window in the bathroom.
The new floor for the garage has been poured.
The garage walls have started.
We decided to do a pitched roof which is cheaper than the hip roof which was there before. I liked the
hip roof better
The new bathroom and now a new garage from the back.
This is inside new bathroom. We built a stepped down wall. This half wall is separating the toilet (which will be on the front left) from the outside door(which is on the back left). The window that you see was supposed to be on the back left side of this room. Unfortunately that wall is below grade so the window could not be put there. Since I had already paid for the window, we put it here beside the door. It will be in front of a sink, so the sink will be a bowl on a low chest so the chest does not cover the window.
Stay tuned for roof ideas