They have started insulating now. There is a big truck that sprays this foam. The form expands and fills the space. Then workers shave the excess off. There was a slight hold up with this. The exterior walls had been removed so if the insulation was spayed, it would fly into the yard in the areas that were open to the outside. We had to wait for the workers (who had been working on another job) to be free so that they could come and put siding on the outside. This allowed the insulation to be sprayed on the inside. Here they have started putting the siding on the house. This is standing in the front court yard looking toward the front door and den. That is the corner of the new new french door we put on our office/bedroom 4.
Here are the walls with insulation on it. This is in the master bedroom.
All the windows are taped up. This is bedroom 2 looking toward bedroom 1.
We are deciding about insulating between the rooms too.
The roof is finally almost finished. It is not the cedar shake but it is OK.
Here is the back of the house. Right where the ladder is is where the new covered porch will be. That roof will extend out beside the pool. The small pitched roof is the new pool bathroom. You can see the white door and problem window to the left of the door.




No comments:
Post a Comment